top of page

IMPA CODE 232105

 

Number of Nominal Steps 6

 

PREFABRICATED STEEL PIPE SCAFFOLDS

Сборная платформа из стальных труб

 

A safe, movable, prefabricated scaffold made of galvanized high tensile steel pipe frames; easy to assemble and disassemble.

 

 

 

 

SHIP STORE ISTANBUL

"Ship Supply and Ship Repair"

232105 PREFABRICATED STEEL PIPE SCAFFOLDS; Steps 6

SKU: 232105
$1,00Price
Quantity

     SHIP STORE   Mühendislik ve Ticaret Ltd Sti.

    bottom of page